Our Latest Projects
Fire Station, Mississauga
Complete plumbing work for the 1 story fire station, New Plumbing Fixtures, Hot water tanks, In-floor Heating, 01 Boiler,03 Pumps, Heating & Plumbing Piping.
Malala Yousafzai Public School, Caledon
Complete mechanical work for new 90,000 sq ft 2-storey public school with more than 40 class rooms, offices, full Gym, change rooms, kitchen, 4 Kinder gardens rooms, Child and Day care rooms, Mechanical Systems comprise of 3 Indoor AH Us, 2 Rooftop- ERVs, 4- Rooftop RTUs, 16-Air Sanitation units, 2 Boilers, 6 Pumps, 2 Water Heaters, Heat Exchanger,Expansion Tanks, Glycol Station, Sump pump,Elevator sump pump, Plumbing Piping with all fixtures and accessories, HVAC Ductwork, Grilles, Diffusers, All Fans, Gas piping, Multiple Ceiling radiant Panels, Wall-fin heaters, Forced Flow Heaters, Unit Heaters, Associated Hydronic piping, HVAC ductwork and piping Insulation work.
Rattlesnake Point Public School, Milton
Complete mechanical work for new 42,000 square feet 3 - storey high school c/w 2 Air Handling Units, 4 Rooftop Units, ERV Unit, 48 Heat Pumps, Split AC Unit, Condensing Unit, Cooling Tower, MUA Unit, 2 Boilers, 2 Gas Fired Heaters, 3 Domestic Water Heaters, 4 Pumps, HVAC Ductwork c/w Grilles, Diffusers, Fans, Variable Air Volume Units, HVAC Insulation, Building Automation Controls, Hydronic & Air Balancing, Refrigeration Piping, Insulation, Heating, Gas and Plumbing Piping with all fixtures and accessories.
Catholic Elementary School, Milton
Complete Mechanical Work for new 50,000.00 sq. feet -2 Story Elementary School, C/W 2 Air Handling Units, 5 Roof top Units, 3 ERV, Wallfin Radiations, Convectors, Radiant Panels, Cabinet Heaters, Radiators, 2 Split System, 4 Condensing units,2 Boilers, 2 Domestic Water heaters, 4 Pumps, HVAC Ductwork c/w Grill Diffusers, Fans, Variable Air Volume, Fan Powered Mixing boxes, Silencers, HVAC & Plumbing Insulation, Refrigeration piping, Vibration lsolation, Heating & Gas piping, Plumbing Piping with all Fixtures and Sprinkler & Fire Protection Work.
St. Peter Catholic Elementary School, Milton
Complete mechanical work for new 7000 square feet 1 story childcare addition for existing school c/w 1 Rooftop Units, ERV Unit, 11 VAV Boxes, 1 Domestic Water Heaters, 2 Pumps, HVAC Ductwork c/w Grilles, Diffusers, Fans, Sprinkler work, HVAC Insulation, Hydronic & Air Balancing, Insulation, Heating, Gas and Plumbing Piping with all fixtures and accessories.
Elsie MacGill Secondary School, Milton
Complete mechanical work for new 1,60,000 square feet 3 - storey high school c/w Air Handling Units, Condensing Units, Rooftop Units, HVAC Units ,Heat Pumps, Fluid Cooler, Boilers, Domestic Water Heaters, Pumps, HVAC Ductwork c/w Grilles, Diffusers, Fans, Variable Air Volume Units, HVAC Insulation, Building Automation Controls, Refrigeration Piping, Insulation, Balancing, Heating, Gas and Plumbing Piping with all fixtures and accessories.
Kaawaate East City Public School, Peterborough
Complete mechanical work for new 70,000 square feet 3 - storey school c/w Air Handling Units, Condensing Units, HVAC Units, Boilers, Domestic Water Heaters, Pumps, Wallfin Heaters, Convectors, Cabinet Heaters, Radiant Panel Heaters, Unit Heaters, HVAC Ductwork c/w Grilles, Diffusers, Fans, Variable Air Volume Units, HVAC Insulation, Building Automation Controls, Refrigeration Piping, Insulation, Balancing, Heating, Gas and Plumbing Piping with all fixtures and accessories.
Thomas Merton Centre – Renovation, Oakville
Complete mechanical work for existing entire school including all Air Handling Units, Condensing Unit, Heat Pumps, Heating plant equipment including Boilers, Expansion Tanks, Pumps, HVAC Ductwork c/w Fans, Diffusers, Grilles, HVAC Insulation, Heating, Natural Gas and Plumbing Piping with all fixtures and accessories.
St. Nicholas Catholic Elementary School, Oakville
Complete mechanical work for new 2-storey elementary school c/w 2 Air Handling Units, 4 HVAC Units, 1 Energy Recovery Ventilator, 2 Condensing Units, 2 AC Units, Hydronic Pumps, Variable Air Volume Boxes, Vibration Isolation, Unit Heaters, Radiant Panels, Wallfins, Plumbing, Ductwork, Gas Pipings, Refrigeration Piping, Insulation, Balancing, Building Automation System Controls.
Viola Desmond Public School, Milton
Complete mechanical work for new 100,000 square feet 2-storey school c/w 2 Make-Up Air Unit, 1 HVAC, 2 Boilers, 8 Water Heaters, 6 Pumps, 3 Heat Recovery Units, 2 Fluid Coolers, Plumbing, Ductwork, Gas Piping, Refrigeration Piping, Heat Pumps, Radiant Panels, Insulation, Balancing and Building Automation System Controls.
Ecole Franco- Niagara, Welland
Complete mechanical work for new 58,400 square feet 2-storey secondary school c/w 3 Air Handling Units, 1 HVAC Unit, 2 Make-Up Air Unit, 2 Energy Recovery Ventilator, 3 Condensing Units, 2 Water Heaters, 2 Boilers, Hydronic Pumps, Variable Air Volume Boxes, Flexible Porous Burner, Unit Heaters, Radiant Panels, Wallfins, Plumbing, Ductwork, Gas Pipings, Refrigeration Piping, Insulation, Balancing, Building Automation System Controls.
Mapleview Elementary School, Dunnville
Complete mechanical work for the new 2-storey secondary school along with the demolition of existing school c/w 3 Air Handling Unit, 2 Boilers, 2 Expansion Tanks, 3 Water Heaters, 1 Air Separator, Exhaust Fans, Unit Ventilators, 3 Condensing Units, Plumbing, Hydronic Heating, Gas Piping, Refrigeration Piping, HVAC Ductwork, Mechanical Insulation, and Building Automation System Controls.
Ecole Secondaire Gaetan Gervais, Oakville
Complete mechanical work for new 42,000 square feet 2-storey secondary school c/w 2 Make-Up Air Unit, 35 Variable Refrigerant Volume, 1 HVAC, 6 Condensing Units, Expansion Tanks, Plumbing, Ductwork, Gas Piping, Refrigeration Piping, Acid Waste Piping, Boilers, Pumps, Radiant Panels, Insulation, Balancing and Building Automation System Controls.
École élémentaire Le Flambeau, Mississauga
Complete mechanical work for new 41,529 square feet 2-storey elementary school c/w 2 Air Handling Unit, 5 Rooftop Units, 3 Condensing Units, Plumbing, Duct Work, Gas Piping, Refrigeration Piping, Boilers, Pumps, Radiant Panels, Insulation, Wallfin Heaters, Balancing and Building Automation System Controls.
St. Alphonsa Catholic Elementary School, Brampton
Complete mechanical work for new 55,000 square feet 2 storey catholic elementary school c/w 1 Cooling Tower, 39 Heat Pumps, 1 Make-up Air Unit, Plumbing, Duct Work, Gas Piping, Glycol Piping, Kitchen Hood, 2 Boilers, Pumps, 1 HVAC Unit, Insulation, Sprinkler, Building Automation System Controls.
Springbrook Public School, Brampton
Complete mechanical work for construction of new school (83,000 square feet) with 26 classrooms, gym, library, office, 8 kindergarten c/w all Air Handling Units, Rooftop Units, Boilers, Pumps, Exhaust Fans, Unit Heaters, Tanks, Plumbing, Irrigation, Hydronic Heating, Gas Piping, HVAC Ductwork, Mechanical Insulation, Building Automation System Controls.
Castle Oaks Public School, Brampton
Complete mechanical work for construction of new school (81,000 square feet) with 26 classrooms, gym, library, office, 8 kindergarten c/w all Air Handling Units, Rooftop Units, Boilers, Pumps, Exhaust Fans, Unit Heaters, Tanks, Plumbing, Irrigation, Hydronic Heating, Gas Piping, HVAC Ductwork, Mechanical Insulation, Sprinker/Fire Protection, Building Automation System Controls.
Lakefield District Public School - Renovation, Lakefield
Complete mechanical work for renovations and additions to existing school (70,000 square feet) c/w new Make-up Air Unit, Exhaust Fans, Unit Ventilators, Plumbing, Hydronic Heating, Gas Piping, Refrigeration Piping, HVAC Ductwork, Mechanical Insulation Building Automation System Controls along with Refurbishing and Rebalancing of existing HVAC & Fan Coil Units.
St. Marks Catholic Elementary School- Addition & Renovation, Burlington
Complete mechanical work for new 46,600 square feet 2-storey daycare addition with existing 2-floor building renovations c/w 10 HVAC Units, Variable Air Volume Boxes, Flexible Porous Burner, 2 Boilers, 1 Domestic Water Heaters, Unit Heaters, Plumbing, Ductwork, Gas Pipings, Insulation, Balancing.
Sheridan College - GGCRP AHU Replacement, Trafalgar Campus, Oakville
Complete renovation mechanical work for existing college c/w replacement of 4 Air Handling Units along with their removal complete with Ductwork, Electrical, Plumbing Piping, Building Automation System Controls and Insulation Work.
Thomas A. Stewart Secondary School - Renovation, Peterborough
Complete mechanical work for interior renovations at an existing 3-storey secondary school (6,000 square feet) c/w new Make-Up Air Unit, 3 Hot Water Tanks, Exhaust Fans, Exhaust Hood, Unit Heater, Plumbing, Refrigeration Piping, HVAC Ductwork, Plumbing Fixtures, Plumbing, and Building Automation Systems Controls.
Trent River Public School, Trenton
Complete mechanical work for new 60,000 square feet 2 storey elementary school c/w 1 Make-Up Air Unit, 37 Heat Pumps, 2 Rooftop Units, 1 Fan Coil Unit, Hydronic Heating, 1 Energy Recovery Ventilator, Glycol Tank, Plumbing, Ductwork, Gas Piping, Refrigeration Piping, Glycol Piping, 2 Boilers, Pumps, Insulation, Sprinklers.
New Stirling Public School, Stirling
Complete mechanical work of 70,000 square feet of the new school with 18 classrooms along with the installation of Air Handling Units, Heat Recovery Ventilators, Fan Coil Units, Chillers, Plumbing Piping, Glycol Piping, Gas Piping, HVAC Duct Work, Kitchen Hood, Kitchen Makeup Air Unit, HVAC Insulation, Gas Piping Work, Building Automation System Controls Work.
Thomas A Blakelock High School - Renovation, Oakville
Mechanical renovation work for existing 2- story high school c/w 3 Washroom, sanitary piping, domestic water piping, venting, 1 ERV-1, VRF System, Wallfins & Unit Heaters, hydronic heating, sheet metal work, BAS Control & Testing adjusting balancing.
Our Lady of the Bay - Renovation, Collingwood
Complete Mechanical work for the existing 1 story school, Replacement of 1 MAU, 5 pumps, 2 Heat Exchanger, Expansion Tanks, AS, Glycol tank, Demolition of existing replaced equipment, Civil Work, Chemical Treatment, Electrical Work, HVAC Sheet Metal Work, TAB & BAS Control work.
St. Timothy & St. Brigid Catholic Elementary School - Renovation, Burlington & Georgetown
Complete Mechanical work for addition of 2 ERV units, 1 in each school, Sheet Metal work BAS Controls, Civil Work, TAB & Electrical work
Highview Elementary School - Renovation, Hamilton
Complete Mechanical renovation for 2 story school, includes replacement if 15 UV, 4 Split AC, 2 RTU (Supplied by owner), BAS Control, Hydronic & Plumbing Piping & TAB
All Saints Catholic Elementary School - Renovation, Markham
Complete Mechanical work for replacement of 2 Boilers, Sheet Metal work, Expansion Tank, Air Separators, HWT, BAS Controls, Civil Work, TAB & Electrical work.
The Pines Senior Public School - Renovation, Newcastle
Complete mechanical work for replacement for hydronic reheat coils, complete with heating piping, TAB, mechanical of demolition of existing, insulation, TAB & BAS Control.
Thomas A. Blakelock High School- Renovation, Oakville
Mechanical renovation work for existing 3- story high school c/w 4 Washroom, sanitary piping, domestic water piping, venting, hydronic heating, sheet metal work, BAS Control & Testing adjusting balancing
St. Matthew Catholic Elementary School- Renovation, Oakville
Complete mechanical work for addition to the existing cafeteria of 1-storey c/w Plumbing, Ductwork, Sprinklers, Rooftop Unit, Mechanical Insulation, Building Automation System Controls and Renovation of Existing Staff Cafeteria.
Montclair Public School- Renovation, Oakville
Mechanical renovation work for existing 2- story high school c/w 3 Washroom, sanitary piping, domestic water piping, venting, hydronic heating, sheet metal work, BAS Control & Testing adjusting balancing.
Centennial College, Cafeteria Addition and Renovation, Toronto
Complete mechanical work for addition to the existing cafeteria of 1-storey c/w Plumbing, Ductwork, Sprinklers, Rooftop Unit, Mechanical Insulation, Building Automation System Controls and Renovation of Existing Staff Cafeteria.
Community Space For Youth-Family Leisure Complex - Renovation, Aurora
Complete mechanical work of renovation of an existing pool, gym area and additional ( of 18,000 square feet) of recreation facility like fitness, studio, programming, room areas c/w HVAC Units, AC Units, Plumbing Piping, HVAC Ductwork, Gas Piping Work, Insulation, Sprinklers, Building Automation System Controls Work.
Millhaven Institution- 96 Bed Max Security Living Unit, Bath
Complete mechanical work of storey five wing 96 bed max security living units, admin rea c/w HVAC Units, AC Units, Boiler, Humidifiers, Pumps, Plumbing, Piping, Heating Piping, Glycol Piping, HVAC Ductwork, Insulation, Gas Piping Work.
Charles E Webster Public School – Addition & Renovation, Belleville
Complete mechanical work of renovation in existing school and (18,000 square feet) addition of a gym and 5 classroom addition c/w Rooftop Units, Hydronic Heating, HVAC Ductwork, Plumbing, Sprinkler, and Building Automation System Controls Work.
Corliss Public School - Addition & Renovation, Mississauga
Complete mechanical work for renovation to the existing classroom library, Boiler, Pumps, VFD, Chimney and Addition of (12000 square feet) of new addition including 2 Kindergarten, Computer Room etc. C/W Roof Top Units, HVAC Ductwork, Plumbing, Heating, Sprinkler, Insulation, Building Automation System Controls.
Oakridge Public School - Addition & Renovation, Toronto
Complete mechanical work of renovation in existing school (12,000 square feet) including 5 kindergartens and (9,000 square feet) of the addition of three classrooms c/w Roof Top Unit, New Unit Ventilators, Plumbing, Heating, Gas Piping, Sprinkler and Building Automation System Controls.
Prince Charles Public School - Addition & Renovation, Belleville
Complete mechanical work for gym & 8 classroom addition (30,000 square feet) and renovation of existing facility c/w 5 new Energy Recovery Ventilator Units, 45 Geothermal Hybrid Heat Pumps, Thermal Generator, Heating Pumps, Insulation, 47 Well Geothermal Loops.
Native Child And Family Services of Toronto - Addition & Renovation, Toronto
Complete mechanical work for renovation and addition to 2 new classrooms c/w Roof Top Units, Radiant Panels, Heaters, Plumbing, Heating, HVAC Ductwork, Sprinklers/Fire Protection, Insulation, Building Automation System Controls.
Animal Shelter, Brampton – HVAC Renovation
Complete mechanical, electrical, structural, civil, roofer work related to the removal of existing HVAC Units Complete With Ductwork, Insulation, Controls With New HVAC Units, Ductwork, Controls While the building was to be operational all the time.
Corsair Public School - Addition & Renovation, Mississauga
Complete electrical and mechanical work for addition (20,000 square feet) of the gym, 8 classrooms and renovation of existing schoolcomplete with 3 Roof Top Air Handling Units, Ductwork, Plumbing Heating, Sprinkler, Controls, Electrical Fixtures, Panel, Fire Alarm, Data, PA, Communication, Gym Stage Lighting, and Sound Work.
Brampton Centennial Secondary School - Renovation, Brampton
Complete mechanical work for science lab and renovation of 4 science labs, including 40 stations c/w all acid/ glass piping, 2 Acid Neutralizing Systems, Plumbing, Heating, Ductwork, Classroom Gas Piping, Insulation, Building Automation System Controls.
Bedford Park Public School- Addition Renovation, Toronto
Complete mechanical work for the addition of 3 storey ( 2 floors+ basement) classroom c/w Plumbing, Steam Piping, Sprinkler/ Fire Protection, HVAC Ductwork, Mechanical Insulation, Building Automation System Controls.
St. Raphael Elementary School - Renovation, Mississauga
Complete mechanical work for renovation of existing school including four kindergartens c/w Makeup Air Unit, 2 Condensing Units, 2 Unit Ventilators, Water Heater, Ductwork, Plumbing Fixtures, Heating, Gas Piping, Insulation, Building Automation System Controls Work.
Maurice Cody Public School – Renovation, Toronto
Complete mechanical work of renovation of the existing school and (224,000 square feet) addition of 3 storey 9 classrooms addition c/w Roof Top Units, In-floor Heating, Steam Piping, Heat Exchanger, Plumbing, Heating, Insulation, Sprinklers, and Building Automation Systems Controls.
Mckee Public School – Renovation, North York
Complete mechanical work for the renovation of two classrooms of the existing school and the new addition (3,190 square feet) including two kindergartens c/w Heat Recovery Units, Wet Heat, Duct Work, Plumbing, Heating, Gas Piping, Refrigeration Piping, Insulation, Building Automation System Controls Work.
Mountainview Public School- Renovation, Collingwood
Complete addition/ renovation mechanical work for existing 1-storey school c/w replacement of the heating plant equipment including 2 new Boilers, 1 Expansion Tank, Pumps, Venting, Heating, Natural Gas Piping, Replacement of all existing Building Automation System Controls, Plumbing.
Cornell Public School – Addition Renovation, Toronto
Complete mechanical work for renovation and addition to 2 new classrooms c/w Roof Top Units, Radiant Panels, Heaters, Plumbing, Heating, HVAC Ductwork, Sprinklers/Fire Protection, Insulation, Building Automation System Controls.
Blooming Lives Montessori Day Nursery – Renovation, Markham
Complete mechanical work for the renovation of one storey daycare building c/w Roof Top Unit, Hot Water Tank, Roof Top Gas Fired Heating and Electric Air Conditioning Units, Duct Work, Plumbing Fixtures, Heating, Gas Piping, Refrigeration Piping, Insulation, Building Automation Systems Controls Work.